Construction Manager for plants 1 and 2 through an ERDC contract with Encana (sold to Enbridge before completion).
The Cabin Gas Plant is located approximately 75 km northeast of Fort Nelson, BC. Crews worked 14 days in and 7 days out with rotations by chopper to and from Fort Nelson, and then to three hubs.
Five 10 Megawatt Warstila Generators were installed. The first three were installed by crane before the facility was constructed. The final two Generators were backed by truck through a temporary opening (panel removed and replaced three times), and then jacked and rolled into final position. The Generators were positioned within 4 mm of target position.